The purpose of this document is to illustrate the plan for road improvement over the next ten years, and to also demonstrate that currently-available funds are insufficient to meet the Town's road improvement needs. It should be noted that this plan does not include any funds for new sidewalk construction nor sidewalk maintenance. It also does not pay for parking lot improvements. It does utilize estimates by the authors based on the cost experience for road paving and improvement over the past four years. It assumes the Town will only utilize the $27,000 provided annually by the MDOT for local road improvement through the Rural Road Initiative (unless otherwise noted). 2004
2005 WITHOUT ADDITIONAL RESOURCES WITH ROAD IMPROVEMENT BOND TO COMPLETE ALL OF VARNEY AND SCAMMON ROADS, CEMTARY LANE AND FRANKLIN PLACE Grind out a short section of Cemetery Lane and resurface: shim and overlay rest of Cemetery Lane and also Franklin Place. Shim and overlay north side of Eveleth Hill, extending to south side as far as possible. Shim and overlay all of Leisure Life Road Grade, add geotextile fabric, and add 8” – 12” of screened gravel to part of the Walden Farm Road – 650' from end of pavement at intersection of Varney Road. ~$8,140 (NOTE: as part of summer roads maintenance budget, will apply surface gravel to North Birch Street and East Road and grade as necessary.) TOTAL FOR WORK BEYOND BOND PROCEEDS: $27,866 TOTAL ALL WORK LISTED for 2005 (or spring 2006): $402,000 (Total for bond proceeds and state local road assistance money = $402,000) ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS ARE COMPLETE 2006 Install underground drainage, curbing, and consider sidewalk along Eveleth Hill from Moosehead Lake Road to top of hill; shim and overlay surface. ~ $27,000 IF VARNEY, SCAMMON, AND LEISURE LIFE ROADS INCOMPLETE Shim and overlay Leisure Life Road ~ $18,000 Shim and overlay Eveleth Hill Road from Moosehead Lake Road to top of hill ~ $9,000 TOTAL: $27,000 2007 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS ARE COMPLETE Shim and Overlay Pine Street ~ $11,000 Shim and overlay 1/3 mile of Crafts Road from Pritham Avenue ~ $16,000 TOTAL: $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Grind, grade, and add 8” to 12” of gravel to first 1,000' of Scammon Road ~ $27,000 IF WE PARTICIPATE IN RURAL ROAD INITIATIVE FOR DREW ROAD Pay 1/3 of total cost for grinding, grading, and resurfacing Drew Road ~ $61,000 2008 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay all of Mayhew Manor Road (Eveleth to Spruce) ~ $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Apply binder and overlay to 1,000' of Scammon Road ~ $12,000 Overlay Oliver Road ~ $15,000 TOTAL: $27,000 IF WE PARTICIPATE IN RURAL ROAD INITITATIVE FOR EAST ROAD Pay 1/3 of total cost for grinding, grading and resurfacing parts of East Road ~ $91,000 2009 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay Sherwood Avenue and Crescent Street ~ $17,000 Shim and overlay Murray Street to Dean Park ~ $10,000 TOTAL: $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Grind, grade, and add 8” to 12” of gravel next 1,000' of Scammon Road ~ $27,000 2010 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay Oliver Road ~ $17,000 Overlay Lewis Road ~ $10,000 TOTAL: $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Resurface second 1,000' of Scammon Road with binder and overlay ~ $14,000 Shim and overlay Murray Street ~ $13,000 TOTAL: $27,000 2011 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay both ends of Shaw Street ~ $18,000 Shim Prospect street ~ $9,000 TOTAL: $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Grind, grade and add 8”-12” of screened gravel to 1,000' of Scammon Road ~ $27,000 2012 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay Foss Street – fix underground drainage if undone ~ $12,000 Shim and overlay South Wiggins Street ~ $15,000 TOTAL: $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Resurface 1,000' with binder and overlay on Scammon Road ~ $15,000 Shim and overlay rest of Scammon Road (to end of pavement at Varney Rd. intersection) and shim and overlay 5-mile crack on Varney Road ~ $12,000 TOTAL: $27,000 2013 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay remainder of Crafts Road ~ $20,000 Shim and overlay Doan Street (and pave plow turn-around if necessary) ~ $7,000 TOTAL: $27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Shim remainder of Varney Road ~ $27,000 2014 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and overlay south end of South Maple Street ~ $13,000 Shim and overlay Depot Street to Industrial Park entrance* ~ $14,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Overlay Varney Road ~ $14,000 Shim and overlay south end of South Maple Street ~ $13,000 TOTAL: $27,000 2015 ASSUMING VARNEY, SCAMMON AND LEISURE LIFE ROADS COMPLETE Shim and Overlay Washington Street ~ 27,000 IF VARNEY AND SCAMMON ROADS INCOMPLETE Shim and overlay Scammon Road from Larsen's to Gagne's (crest of hill) ~ $18,000 Shim and overlay School Street ~ $9,000 TOTAL: $27,000 This schedule does not account for any work for a ten year period on the following paved streets which currently require work (list will grow over time):
|